PLATINUMEDGE Impact Bolt Extractor Set 13-Piece
Product description
Key features
If you’ve ever dealt with stripped bolts, rounded nuts, or rusted hardware, the PLATINUMEDGE 13 Pieces Impact Bolt & Nut Remover Set is built to help you get past the stubborn part of the job. This extractor tool set combines high-durability Cr Mo steel construction with an impact oriented design, so you can keep working even when fasteners feel seized or damaged. 🧰 It’s the kind of set that fits common repair scenarios where the bolt or nut won’t cooperate.

The set uses spiral reverse flutes designed to bite into damaged threads for stronger grip. That biting action matters because it helps transfer force where it counts, rather than letting an extractor slip under pressure. You also get metric and SAE sizes across the 13 piece lineup, with clearly marked sizes that help you identify the right fit quickly during a repair. 🔩 For faster turnarounds in vehicle work, appliance fixes, or industrial maintenance, having the right size extractor ready is a big deal.


What to know

This tool set is designed around a 3/8 inch square drive interface, so it can be used with hand ratchets, impact wrenches, and air ratchets. That flexibility can be useful because different jobs and different shops often rely on different driving tools. The internal thread design is also described as precision made to extract damaged bolts, nuts, and screws, including cases where fasteners are stripped, rusted, or frozen.
A lot of problems with removed hardware come down to controllability and alignment. This set addresses that with the square drive connection and the reverse spiral geometry intended to improve purchase as force is applied. Keep in mind that you still need to choose the proper extractor size for the fastener you’re dealing with, since correct matching is what helps the tool bite reliably.



For storage, you get a molded, durable storage case that helps keep the extractors organized between projects. That means fewer loose parts to sort through, especially when you switch between a vehicle repair task and an appliance or maintenance job. 📦 When tools are protected and kept in order, you spend less time searching and more time getting the fastener out.
Tech specs

- Material: Cr Mo extraction tool steel
- Type: Impact bolt and nut remover set
- Drive: 3/8 inch square drive
- Pieces: 13 piece set
- Sizes included: 19 mm, 17 mm, 16 mm, 14 mm, 13 mm, 12 mm
- Sizes included: 7/16 inch, 11 mm, 10 mm, 3/2 inch, 0.3 cm, 0.38 mm, 1/4 inch


What stands out for everyday repairs

It suits you if your workload includes stripped bolt and nut removal, especially when hardware is rounded, rusted, or stuck and you need a strong grip to regain progress. You’ll likely appreciate it if you work on vehicles, handle appliance repairs, or support industrial instruments where damaged fasteners are a recurring problem. The ability to use it with hand ratchets, impact tools, and air ratchets can fit the way many DIY garages and shop benches actually operate. 🔧 Choose the extractor size that matches the hardware you’re removing, then drive with the tool type you have on hand for best control and bite.
Who it’s for

A solid pick for mechanics, maintenance technicians, and serious DIYers who frequently run into seized, stripped, or rounded fasteners. It makes sense if you want one compact set that covers a broad range of metric and SAE sizes for common repair categories. If you often need to tackle broken hardware on equipment and instruments, the included storage case helps keep your tools ready when you need them.
Products with discounts that might interest you
- Petra HD201 2 Gallon pump sprayer for weeds
- pickpiff Adhesive Wall Hooks 13 lb Heavy-Duty Pack of 4 🪝
- Protmex Cordless Impact Wrench 900 ft-lbs
- RAINDEWAY 6x8 Feet Heavy Duty Waterproof Tarp (10Mil) with Metal Grommets and Reinforced Edges
- Ravinte 5 Inch Cabinet Pulls Matte Black Stainless Steel
- Seesii Mini Chainsaw (6-inch, Cordless) With 2 Batteries — Handheld Power Chain Saw for Tree Trimming and Wood Cutting
- SHJADE 20W Mini Hot Glue Gun Kit with 30 Sticks (White)
- SKIL SR232301 Multi-Function Detail Sander 12pc 🛠
- SpacEver Spacever Heavy Duty Tarp (20x40 FT, 12 Mil Thick) for Outdoor Pool Roof Tent, Firewood & More
- SPTA SQMIX65 buffing polishing pads kit
- SUNHZ MCKP 1/2" Drive Deep Impact Socket Set (17-Piece) for Axle Nuts, CR-MO, SAE + Metric
- 100FT Heated Water Hose for RV 1/2"
- GXOACKJ 32-48 inch Curtain Rod Set, 5/8 in 🪟
- VEVOR 65-piece Impact Socket Set
- JOAPRIL Deck Joist Tape 1-5/8" x 50
- Creality PETG Filament 1.75mm 1kg for 3D Printing 🖨
- BOSCH GDS18V-350N 410 Ft.-Lbs Impact Wrench
- ELEGOO PLA Plus 2.2 lb spools, 4-pack
- Airmoto Tire Inflator Bundle 1 — Portable Air Compressor ⛽
- Tckasdj Starlink Gen 3 Mount: 360° Adjustable, Telescoping, Heavy-Duty Wall/Pole Mount
- ARTFLAMM Powerful Propane Torch Gun with Turbo Mode (Charcoal Torch Lighter, Safety Lock) — Tank Not Included
- Butyl Joist Tape 2x50' 10 Rolls
- ARTFLAMM Propane Torch Gun Turbo Mode
- Jwxstore 24 Pack Adhesive Hooks 33lb max 🏠

