Vesgantti 10.3 Inch Hybrid Mattress 135x190cm
Product description
This hybrid double mattress from Vesgantti combines pocket springs with breathable foam to offer balanced support and comfort for everyday sleep. The 10.3 inch (26 cm) profile and medium-firm feel aim to reduce pressure points while maintaining a resilient sleeping surface, suitable for couples and those seeking improved spinal alignment.
Key Points

The mattress integrates a 7-zone pocket spring system that adapts to the body’s different areas, providing targeted support for head, shoulders, waist, hips, knees and feet. The individually wrapped springs help to reduce motion transfer, so movement on one side is less likely to disturb a partner. The classic box top finish adds a softer sleeping surface while reinforced edges increase usable sleeping area and make sitting on the edge more stable. According to the manufacturer, the cover fabric is skin-friendly and designed for breathability, which helps to manage heat and moisture during the night. Note that the mattress arrives compressed in a box and typically reaches around 90% size within a few hours, with full expansion taking up to 72 hours.


Technical Specifications

- Name: Vesgantti Double Mattress 10.3 Inch Hybrid (135x190x26cm)
- Height: 26 cm (10.3 inches)
- Size: 135 x 190 cm (4FT6 double)
- Support system: 7-zone individually pocketed springs
- Comfort layers: multi-layer breathable foam and box top fabric
- Firmness: medium firm
Benefits



The zoned spring layout focuses support where it is most needed, which can help maintain a more neutral spine position across different sleeping postures. The combination of foam layers and a box top surface produces a cushioned feel without excessive sinkage, which may suit those who want a balance between softness and stability. The reduced motion transfer is useful for light sleepers sharing a bed, and the reinforced edge offers added durability and convenience when getting in and out of bed.
Usage Recommendations

Allow the mattress to expand fully for up to 72 hours after removal from the packaging before using bedding. Rotate the mattress periodically to distribute wear more evenly across the surface. For mattress protectors choose breathable materials to preserve the airflow characteristics of the cover and foam. Consider that medium-firm comfort may not suit those who prefer very soft or very firm surfaces, and check mattress depth against fitted sheet compatibility due to the 26 cm height.
Products with discounts that might interest you
- Matoresu 25CM Double Hybrid Mattress with Cooling Gel Memory Foam (135x190x25CM) – medium firm
- dosleeps Small Double Mattress 4FT 9-inch 120x190cm mattress
- wowttrelax Folding Mattress Double 4 Inch
- Doubleslee Memory Foam Mattress 5ft King
- ELEMUSE 10.6 Inch Medium Firm Hybrid Mattress 135x190cm
- FRIDEKO Single Memory Foam Topper 90x190x11cm
- Feandrea Orthopedic Dog Bed 120 x 85 cm
- Gwydre tri-fold memory foam mattress 10cm
- Inofia Original Collection Double Hybrid Mattress (Memory Foam & Pocket Springs) – Medium Firm, 10.3 Inch
- Inofia Folding Mattress Small Double (15cm) – gel memory foam foldable guest mattress in a box
- wowttrelax Folding Mattress Double (6 inch) – 4-fold memory foam floor mattress for guests, camping and caravans
- JOEJOY XL Orthopedic Dog Bed 107x76x24 cm
- JOYELF XLarge Memory Foam Dog Bed
- Lopekuty Premium Air Mattress with Built-in Pump (Double) – 203 x 152 x 46cm
- Nepfaivy Dog Bed Extra Large 105×70×7.5cm
- OlarHike Inflatable Mattress 190x140cm
- SCEPKN 4FT6 Double Mattress 135x190cm Double bed mattress
- Silentnight 7 Zone Memory Foam Rolled Mattress King
- Vesgantti 2FT6 Small Single Mattress 75x190 cm, 10.6in pocket sprung mattress
- Giovanly King Size Hybrid Mattress
- NineLan Orthopaedic Double Mattress 4FT6 – 135x190x27cm
- SZsuilong 3ft Single Hybrid Mattress — 7-Zone Orthopaedic, Medium Firm, 90x190x28cm
- Twirest Double Mattress 4FT6 – Hybrid Memory Foam & Pocket Sprung, 135 x 190 x 22 cm
- Vesgantti Small Single Hybrid Mattress 2FT6



