Vesgantti Small Single Hybrid Mattress 2FT6
Product description
If you want a small single mattress that keeps the body supported through the night, the Vesgantti Small Single hybrid mattress is a practical option to consider. It combines breathable foam comfort with independently wrapped pocket springs, aiming to help reduce motion disturbance while you sleep. With a medium firm feel and a compact size of 75 x 190 x 26cm, it suits everyday bedroom setups where space matters.
The essentials

The Vesgantti Small Single Mattress 2FT6 is built around a smart 7-zone support system, designed to deliver targeted comfort across different parts of your body. That support approach is intended to support healthy spinal alignment, whether you sleep on your side, back, or stomach. Comfort is handled by breathable foam layers that are meant to help you stay comfortable and dry through the night, rather than trap heat. 🌙


It also uses an individually wrapped pocket spring layout, with hundreds of springs working independently. This design is helpful for motion isolation, so movement from a partner is less likely to travel across the mattress. You may also notice less spring friction noise compared with designs where springs are more connected.

The size makes it a good fit for smaller rooms and flexible sleeping arrangements. It is described as suitable for kids beds, bunk beds, spare rooms, guest beds, lofts, and apartments, so you can choose it without forcing a larger, bulkier mattress into the space. 🛏️
Key features



A key feature is the Smart 7-Zone Mattress design, which uses a zone system to offer targeted support where your body needs it most. Instead of treating the entire sleep surface the same way, the mattress is planned to respond differently across areas, with the goal of maintaining comfortable posture during sleep. This can be especially useful if you tend to change position throughout the night.
Comfort comes from the Comfort Breathable Foam layers, which Vesgantti describes as multi-layer and breathable. The mattress is also stated to be non-toxic, hypoallergenic, and baby-friendly, with comfort designed to adapt to your body heat for a more neutral feel. If you want a small single mattress that is less likely to feel stuffy, that breathable foam approach is one of the main reasons to look at this model. ✅

For sleep calm, the individually wrapped spring construction is a standout element. Each pocket spring is meant to work independently, which helps minimise motion transfer and can reduce friction noise between springs. Whether you sleep alone or share the bed, it is designed to support more uninterrupted rest.


Finally, it is supplied as a mattress-in-a-box, rolled and compressed for easier handling. That can make setup simpler in a busy home, especially if you are moving it into a loft or spare room. It is also backed by a 100-nights trial, giving you time to sleep on it and assess suitability for your preferences. 🙂

Tech specs

- Name: Vesgantti Small Single Mattress 2FT6 hybrid mattress
- Type: Hybrid mattress with breathable foam and individually pocket springs
- Size: 75 x 190 x 26cm
- Thickness: 10.2 inch
- Firmness: Medium firm
- Support system: Smart 7-zone mattress
- Spring design: Individually wrapped pocket springs with edge support and motion isolation
Products with discounts that might interest you
- iDOO King Size Inflatable Air Mattress with Built-In Pump
- OlarHike Inflatable Mattress 190x140cm
- TeQsli 4FT Small Double Hybrid Mattress (Gel Memory Foam & Pocket Sprung) – 7-Zone Medium Firm 120x190x27cm
- SCEPKN 4FT6 Double Mattress 135x190cm Double bed mattress
- DAJIYUHC King Mattress 5FT 10 Inch Hybrid Mattress in a Box (150x200cm) – Medium Plush, motion isolation
- Silentnight 7 Zone Memory Foam Rolled Mattress King
- Hybrid Pocket Spring Mattress 90 x 190
- TeQsli 5FT King Mattress 150x200cm Medium Firm
- Vesgantti Folding Mattress Double 135x190cm with 15cm Tri-Fold Gel Memory Foam
- Uliyati Small Double Memory Foam Mattress (120x190x16cm) – Breathable, Pressure-relieving Sleep
- MOLPHIT 12 Inch Double Mattress 135x190cm
- Vesgantti Double Mattress 135x190cm 10 inch hybrid mattress
- wowttrelax 4FT Small Double Mattress 120x190cm
- Baodan Dog Bed Large 90x60 cm cushion
- Bednew Double mattress 35cm pocket hybrid
- Bedsure Orthopedic Dog Bed 122x89cm
- BingoPaw Calming Dog Bed 76x51x10cm
- Bonnvia Mattress Topper Double Bed 1 — Mattress
- SZsuilong 4ft6 Double Mattress — 11 Inch Hybrid Pocket Sprung Orthopaedic Mattress
- Matoresu 25CM Double Hybrid Mattress with Cooling Gel Memory Foam (135x190x25CM) – medium firm
- wowttrelax Folding Mattress Double 4 Inch
- ELEMUSE 10.6 Inch Medium Firm Hybrid Mattress 135x190cm
- Feandrea Orthopedic Dog Bed 120 x 85 cm
- Inofia Original Collection Double Hybrid Mattress (Memory Foam & Pocket Springs) – Medium Firm, 10.3 Inch

