Download app on Google Play


Imagen de Vesgantti 16CM Single Memory Foam Mattress en OfertitasTOP
New offer
Thumbnail principal de Vesgantti 16CM Single Memory Foam Mattress
Thumbnail 1 de Vesgantti 16CM Single Memory Foam Mattress
Thumbnail 2 de Vesgantti 16CM Single Memory Foam Mattress
Thumbnail 3 de Vesgantti 16CM Single Memory Foam Mattress
Thumbnail 4 de Vesgantti 16CM Single Memory Foam Mattress
Thumbnail 5 de Vesgantti 16CM Single Memory Foam Mattress
Thumbnail 6 de Vesgantti 16CM Single Memory Foam Mattress

Vesgantti 16CM Single Memory Foam Mattress

Amazon
Reviews
4,4
+158

Reviews

4,4
+158 reviews

Price

£109.99£65.52-40%
View offer

View offer

Product description

Highlights

The Vesgantti 16cm single memory foam mattress blends cooling gel comfort with breathable edge mesh, offering a balanced sleep surface for everyday use. It arrives rolled in a box for easy handling and expands within 48 to 72 hours, ready for a night of steady support and reduced pressure points.

Detalle de Vesgantti 16CM Single Memory Foam Mattress

Tech specs

Detalle 1 de Vesgantti 16CM Single Memory Foam Mattress
Detalle 2 de Vesgantti 16CM Single Memory Foam Mattress
  • Name: Vesgantti Single Mattress
  • Size: 90x190x16cm
  • Material: Memory foam with cooling gel foam
  • Colour: Ocean-inspired cover
  • Weight: Not provided
Detalle de Vesgantti 16CM Single Memory Foam Mattress

Benefits

This mattress aims to ease common sleep complaints by combining a gel memory foam layer that contours to the body with a high-density foam base for stability. The gel layer helps moderate temperature according to the manufacturer, while the reinforced support foam keeps the spine aligned through typical sleeping positions. The washable outer cover features a playful whale and wave motif that freshens a bedroom without being overstated.

Detalle de Vesgantti 16CM Single Memory Foam Mattress
Detalle 1 de Vesgantti 16CM Single Memory Foam Mattress
Detalle 2 de Vesgantti 16CM Single Memory Foam Mattress

Best use cases

Lightweight and compact to move when new, the mattress is practical for guest rooms, student flats and children's bedrooms. It fits bunk frames, slatted platforms and conventional bases. It’s a sensible option if you want a medium-firm feel with cooling emphasis, but bear in mind it needs the recommended expansion time after unboxing according to the manufacturer.

Detalle de Vesgantti 16CM Single Memory Foam Mattress

Quality and care

Detalle 1 de Vesgantti 16CM Single Memory Foam Mattress
Detalle 2 de Vesgantti 16CM Single Memory Foam Mattress

The cover unzips for easy washing which helps with hygiene over time. Certifications include CertiPUR-US and OEKO-TEX STANDARD 100 which indicate the foam is tested for certain harmful substances. The product is supplied with a 100-night trial and a 10-year support promise from the seller, offering reassurance on durability and comfort choices.

Detalle de Vesgantti 16CM Single Memory Foam Mattress

Who it suits

Detalle de Vesgantti 16CM Single Memory Foam Mattress

You’ll like this mattress if you prefer a medium support level with pressure relief from memory foam and a cooling focus. It makes sense for buyers seeking a compact, easy-to-handle mattress with practical care features and recognised safety certifications. Vesgantti Single Mattress brings a modest design touch while prioritising everyday comfort. 🛏️🌊🌀.