Vesgantti 20cm Double Memory Foam Mattress 135x190 cm
Product description
This double memory foam mattress combines cooling gel comfort with firm support for nights when pressure relief and a stable base matter most. The Vesgantti 20cm double mattress offers a reversible feel so you can choose a medium-firm sleeping surface or firmer support depending on preference, making it suitable for couples with different firmness needs.
Key Points

The top layer is a 4cm gel memory foam that contours to the body and is engineered to reduce pressure points while helping to regulate temperature according to the manufacturer. The 16cm high density support foam underlayer provides a stable foundation and consistent spinal alignment, which may help reduce motion transfer during sleep. The mattress arrives compressed and rolled for easier handling and typically requires 24 to 48 hours to fully expand, with faster expansion in warmer rooms.


Technical Specifications

- Name: Vesgantti 20CM Double Memory Foam Mattress
- Size: 135 x 190 x 20 cm
- Layers: 4 cm gel memory foam top, 16 cm high density support foam base
- Firmness: Dual-sided, medium-firm (gel side) and firm (support foam side)
- Cover: Removable knitted fabric with purple-blue geometric pattern
The Best of This Model



The washable cover adds a practical touch by allowing simple maintenance of the sleeping surface. The design includes certifications such as CertiPUR-US and OEKO-TEX STANDARD 100 according to the manufacturer, which indicates the foams are free from certain harmful substances. A 100-night trial period and a 10-year support policy are offered, giving time to adapt to the mattress and assess comfort in your home.
Usage Recommendations

Unbox the mattress in the room where it will be used and allow it to expand undisturbed for up to two days. Flip the mattress to test both firmness options and give the body two to four weeks to adjust to the new sleeping surface. Consider that in cold conditions expansion can take longer, and that memory foam reacts to temperature so the feel may change slightly with room climate.
Products with discounts that might interest you
- slily 12 Inch 4ft 6 Hybrid Mattress (135 x 190cm) with 7-Zone Pocket Sprung & Memory Foam for Back Pain
- Inofia King Size Mattress 10.6 Inch Hybrid Mattress
- Vesgantti European Small Single Pocket Sprung Mattress 80x200 cm with Pillow Top (Medium)
- JOEJOY Dog Bed Medium washable anti-anxiety mattress
- Inofia Small Double Hybrid Mattress 4FT
- JOYELF XLarge Memory Foam Dog Bed
- Inofia Original Collection Double Hybrid Mattress (Memory Foam & Pocket Springs) – Medium Firm, 10.3 Inch
- Nalone King Air Bed Inflatable Mattress with Built‑in Pump 203x152x46cm Queen/Double
- Inofia Folding Mattress King Size (15cm) tri-fold memory foam – foldable guest mattress with washable cover
- Nepfaivy Dog Bed Extra Large 105×70×7.5cm
- Vesgantti Single Mattress (20cm) Gel Memory Foam, Medium Firm, 90x190x20cm – Lavender Purple
- NewentorLife 7cm Firm Mattress Topper Double Bed
- PurrJoys 4FT6 Double Mattress — 25cm, Medium Firm Support, Gel-Infused Comfort
- SEZMOONSI King Size Hybrid Mattress with Gel Memory Foam, 150x200x23cm
- TeQsli Single Mattress 10 Inch Gel Memory Foam 90x190x25 cm
- Uliyati Double Memory Foam Mattress 135x190x26 cm
- Vesgantti 11 Inch Pocket Spring Single Mattress
- wowttrelax King 5ft 8 memory foam mattress
- Inofia Single Mattresses Memory Foam Sprung Hybrid 3FT (10.3 Inch) – Medium Firm, Zone Support
- Twirest 15cm Single Mattress with Gel Memory Foam, Anti-mite Cover & Removable Cover (90x190x15cm)
- TeQsli 4FT6 10 Inch Hybrid Double Mattress 135x190x25cm
- Inofia Double memory foam hybrid 4FT6
- KSIIA Large Orthopedic Dog Bed 105x70 cm
- Vesgantti 2FT6 Small Single Pocket Sprung Mattress (75 x 190 cm) – Medium, 11 inch hybrid with 9 zones



